|
ENGINEERING |
|
|
|
1.
Name of the Institution |
P. A. College of
Engineering,
Nadupadavu, Kairangala, Near Mangalore University,
Bantwal Taluk, Mangalore – 574 153.
Tel : 0824 – 2284701 / 2 / 3 / 4.
Fax: 0824 – 2284705.
E-mail: administrator@paengg.com |
|
2. Name and
Address of the Principal |
Dr. S. A. Khan
(B.Sc. (Engg.), M.Tech. Ph.D.)
Tel. : 0824 – 2284709
Mob : 9845531478
E-mail : sherkhan-16@yahoo.com |
|
3. Name
of the affiliating University |
Visvesvaraya
Technological University,
“Jnana Sangama”, Machhe, Belgaum,
Karnataka. |
|
4. Governance |
P. A. Educational
Trust (R)
P. A. College of Engineering Campus,
Nadupadavu, Kairangala, Near Mangalore University,
Bantwal Taluk, Mangalore – 574 153.
Tel : 0824 – 2284701 / 2 / 3 / 4.
Fax: 0824 – 2284705. |
P. A. Educational Trust
was founded by Dr. P. A. Ibrahim, an Engineer, a Philanthropist and
Educationist and NRI Businessman of repute. He has business
establishments in various fields, Textile, Garments,
Hospitality, Automobile, Rubber, Plastic Products, spread over
GCC countries and
India. Dr.
P. A. Ibrahim heads the trust as its Chairman and Managing
Trustee.
|
Name of
the Members: |
|
|
1. Dr. P. A. Ibrahim |
Chairman &
Managing Trustee |
|
2. Mr. P. A. Latif |
Trustee |
|
3. Mr. V. Hashim |
Trustee |
|
4. Mr. K. M. Haneef |
Administrator (Member) |
|
5. Mr. Ahamed Kutty |
Finance
Manager (Member) |
|
6. Principal |
Member
Secretary |
|
Frequency
of the Board Meetings |
Once in a month |
Organization Chart:

ã
Student Feedback on Institutional Governance or Faculty
performance:
Student feedback forms is
supplied to the student to judge the faculty method etc.
Students are
encouraged to represent their cases through
individual and through group representations.
V. Programmes:
Name of the Programmes Approved by AICTE:
|
Programme/Course
|
No. Seats |
Cut off % Last Year |
Duration |
|
B. E. in: |
|
Max. |
Min. |
|
|
Electronics & Communication
Engineering |
120 |
94% |
45% |
4-Year (8 Semesters) |
|
Computer Science & Engineering |
90 |
94% |
45% |
|
|
Information Science & Engineering |
60 |
91% |
45% |
|
|
Telecommunication Engineering |
60 |
87% |
45% |
|
|
Mechanical Engineering |
60 |
86% |
45% |
|
|
Biotechnology |
30 |
92% |
45% |
|
Name of the
Programme (Part Time) approved by the AICTE --
None
Training and Placement
Cell:
P. A. College of Engineering has on independent Training
Placement Cell with the sole objective of providing quality
manpower to industries by organizing campus interviews. It is
headed by a Training & Placement Office assisted by staff &
student placement co-ordinators forming a team of placement
representatives from various branches/disciplines. The Training
& Placement Cell is equipped with necessary audio Visual
facilities and seminar cum interview rooms. It provides the best
arrangements and hospitality to the visiting companies.
The cell also conducts the
following programmes to train the students facing campus
interviews.
-
Guest lectures by eminent
personalities from industry for career counseling
-
Co-coordinating industrial
visits and technical seminars arranged by various departments.
-
Training students through
mock interviews, aptitude test & CD sessions by reputed
trainers.
-
Co-coordinating & guiding
students to undergo industrial training in reputed industries.
-
Annual campus training on
personality development, career planning & soft skills.
ã
Placement Statistics (2005-06 ,
2006-07 & 2007-08):
|
Company |
No. of
Students placed |
|
|
|
-
Infosys
Technologies, Bangalore
|
60 |
|
|
39 |
|
|
29 |
|
|
29 |
-
Wipro
Technologies, Bangalore
|
19 |
|
|
30 |
-
iGate Global Solutions, Bangalore
|
30 |
|
|
22 |
|
|
20 |
|
|
18 |
-
Satyam Computer Services Ltd., Hyderabad
|
18 |
|
|
18 |
-
M-Power Consultancy, Bangalore
|
16 |
|
|
12 |
-
Jindal Steel Workers, Bellary
|
12 |
-
HCL
InfoSystem, Bangalore
|
12 |
|
|
10 |
-
Siemens Information System Ltd., B'lore
|
10 |
-
ICICI Prudential, Secundrabad
|
08 |
-
Huawei Technologies Pvt. Ltd., Bangalore
|
08 |
|
|
08 |
|
|
06 |
-
Shriram Transport Co., Chennai
|
06 |
-
Accord Software & Systems,
B'lore
|
06 |
-
Jetking and Cartel Networks,
B'lore
|
06 |
|
|
06 |
-
Sonata Software, Bangalore
|
06 |
|
|
04 |
-
Torry Harris Business
Solutions
|
04 |
-
Ruchi Soya Industries
Limited, Indore
|
04 |
-
Persistent Systems Pvt.
Ltd., Goa
|
04 |
|
|
04 |
-
i-Wave Systems Technologies
Pvt.
|
04 |
|
|
04 |
-
Cognizant Technologies,
Bangalore
|
04 |
|
|
02 |
-
Omneysys Technologies,
B'lore
|
02 |
|
|
02 |
-
JH-BIO Pvt. Ltd., Bangalore
|
02 |
|
|
02 |
-
Socretes Software Ltd,
Bangalore
|
02 |
-
Integra Micro Systems,
Bangalore
|
02 |
|
|
02 |
-
Aerospace Laboratories,
B'lore
|
02 |
|
|
02 |
-
Bharathi Shipyard, Mumbai.
|
02 |
Fee: As
prescribed by fee fixation Committee / State Government from
time to time.
|
Time Schedule |
Beginning of the Academic year |
|
Number of Scholarship Offered by
the Institution |
|
|
Estimated Cost of Boarding and
Lodging in Hostels |
Rs. 30,000/- PA. |
Name and duration
of programme(s) having affiliation /collaboration with Foreign
University(s) /institution(s) and being run in the same Campus
along with status of their AICTE approval. If there is foreign
collaboration, give the following details
There is no foreign collaborative Programme is being run at
PA College of engineering.
ã
VII. Profile of Principal with
qualifications. Total experience age and duration of employment at
the institute concerned enclosed. (Name, Date of Birth, Educational
Qualification etc.)
[Click
here for Details]
ã
VIII.
FEE:
As per the norms of Govt. of Karnataka.
Yearly tuition fee and fee is collected in
one installment. The other fee payable to university is
collected during the first year only. Examination fee to be
remitted to the university is collected every semester and the
amount depends on the prevailing university rate and number of
papers registered by the students in each examination. The
yearly hostel expenses including mess is estimated to be Rs.
30,000/- (approximately).
IX. Admission:
(Admission process on going for the Academic Year 2008-09)
|
*
Sanctioned Intake |
420
(2007-08) |
|
Admitted |
420
(2007-08) |
X. Application Received
(Mgt. Quota)
Admitted
2005-06
210 146
2006-07
210
210
2007-08
210
210
XI. Admission
Procedure:
During 2007-08 Government Quota (45%) seats are filled through
common Entrance Test Cell of Government of Karnataka. Management
quota of seats are filled through the test conducted by the
Association of Private Professional Colleges i.e. KRLMPCA (Reg.)
Calendar for admission against Management / Vacant seats:
As per the guidelines issued from time to time by the
competent authority.
Name & Test Agency:
Karnataka Religious &
Linguistic Minority Professional colleges Association (Regd,)
Suryamukhi, Garden Apartments, Vittal Mallya Road, Bangalore- 01.
Website: www.kmca.info Email: info@kmca.info
ã
XII. Criteria and weightage for admission:
During the academic year 2007-08 admissions were made on the
basis of marks obtained on K-CET and KRLM-CET Vacant seats are
filled on the basis of % obtained in the qualifying examinations.
XII.
APPLICATION FORM:
[Click
here to download the Application Form]
XIII. LIST OF
APPLICANTS: (Process on going)
XIV. RESULTS:
|
S.No. |
Course |
Year |
Sanctioned Intake |
Students Admitted/ Appeared |
Students Passed out in first
attempt |
% of Students passed in first
attempt |
% of Students passing out with
Distinction |
% of Students with 1st Division |
% of Students with IInd Division |
|
1 |
ISE |
2005-06 |
90 |
64 |
63 |
98.4% |
85.9% |
12.5% |
-- |
|
2 |
CSE |
- |
90 |
73 |
69 |
94.5% |
53.4% |
41% |
-- |
|
3 |
ECE |
- |
90 |
72 |
71 |
98.6% |
91.6% |
6.9% |
-- |
|
4 |
TCE |
- |
90 |
55 |
55 |
100% |
92.7% |
7.2% |
-- |
| |
|
|
60 |
|
|
|
|
|
|
|
2006-07 |
|
1 |
ISE |
2006-07 |
60 |
54 |
-- |
94.44% |
74.5% |
25.5% |
-- |
|
2 |
CSE |
- |
60 |
60 |
-- |
91.66% |
49.1% |
45.45% |
5.45 |
|
3 |
ECE |
- |
60 |
76 |
-- |
92.1% |
45.71% |
48.57% |
5.72 |
|
4 |
TCE |
- |
60 |
40 |
-- |
95% |
50% |
50% |
-- |
|
5 |
BT |
|
30 |
21 |
|
100% |
76.19% |
23.81% |
-- |
|
2007-08 |
|
1 |
ISE |
2007-08 |
60 |
43 |
32 |
74.41% |
75% |
25% |
-- |
|
2 |
CSE |
- |
90 |
71 |
61 |
86% |
54.10% |
44.26% |
1.64 |
|
3 |
ECE |
- |
120 |
100 |
92 |
92% |
54.35% |
39.13% |
6.52 |
|
4 |
TCE |
- |
60 |
46 |
37 |
80.43% |
67.57% |
24.32% |
8.11 |
|
5 |
ME |
- |
60 |
35 |
35 |
100% |
100% |
-- |
-- |
|
6 |
BT |
|
30 |
26 |
26 |
100% |
80.77% |
19.23 |
-- |
ã
XV.
INFORMATION ON INFRASTRUCTURE AND OTHER RESOURCES AVAILABLE:
|
LIBRARY: |
| No.
of Titles |
2,990 |
| No.
of Volumes |
14,308 |
| No.
of Journals |
45
print + 120 e-Journals(IEL-ONLINE) |
In addition to above IEL On line
(IEEE / IEE Electronic library) covers almost one third of the
world’s current Electrical Engg. and Computer Science literatures. The library subscribes e-journals through INDEST-AICTE
consortium.
Membership: DEL NET
ã
|
LABORATORY ITEMS |
|
|
|
I. COMPUTER Sc. &
INFORMATION Sc. DEPARTMENT |
|
Computing Facilities:
The Computing facility comprises of 525 computer systems of
various configuration including Server systems etc.
All the systems of the College are connected through LAN
(Campus wide Network)
1 Mbps (Bandwidth) Leased Line Internet facility. |
|
|
Sl. No. |
Item Name |
Particulars
|
Nos. |
Amount [In Rs.] |
|
1 |
Server-1 |
IBM e-Server (x-Series
226-Type 8648): Intel Xeon 3.0GHz., 2MB Level2, 1GB PC2-3200
ECC DDR2 RAM, 2 * 73GB SCSI Hard-disk, 1.44MB FDD, 52x (EIDE)-CD-Drive,
Gigabit Dual port (10/100/1000 MBPS) Ethernet Card, I/O slots:
2 serial , 1 pll, 2 USB, IBM keyboard, IBM mouse. |
1 |
1,15,000 |
|
2 |
Server-2 |
IBM SERVER NETFINITY 3000
with Netfinity installation software & Lotus Domino
Application Server Software. |
1 |
1,56,436 |
|
3 |
Server-3 |
PCS Oriion Server with
1.7Ghz Speed Processor, 256MB RAM, 2 x 40GB HDD, 52x CD-ROM,
15" Color Monitor, NIC, Mouse + Keyboard |
2 |
77,760 |
|
5 |
Desktop Computers |
P4 Systems of HCL brand
with 2.66GHz. speed Processor, ASUS motherboard, 512MB RAM, 80GB SATA HDD, 15"
Color Monitor, 52x CD ROM, 1.44MB FDD, NIC, Keyboard +
Optical Mouse. |
30 |
|
|
6 |
Desktop Computers |
P4 Systems of HCL brand
with 2.93GHz. speed Processor, Intel 915 GV chipset, 256MB RAM, 80GB
SATA HDD, 15" Color
Monitor, 1.44MB FDD, NIC, Keyboard + Optical Mouse. |
30 |
8,32,230 |
|
7 |
Desktop Computers |
P4 Systems of HCL brand
with 2.4GHz. speed Processor, Intel 845GV chipset, 256MB RAM,
80GB HDD, 15" Color
Monitor, 1.44MB FDD, NIC, Keyboard + Optical Mouse. |
35 |
7,55,259 |
|
8 |
Desktop Computers |
P4 Systems of PCS brand
with 1.4 GHz. speed Processor, 128MB SDRAM, 40GB HDD, 15"
Monitor, 1.44MB FDD, NIC, Keyboard + Optical Mouse. |
34 |
10,84,050 |
|
9 |
Desktop Computers |
Intel Celeron Systems of
PCS brand with 1.0GHz. speed Processor, 128MB SDRAM, 15"
Monitor, NIC, Keyboard + Optical Mouse. |
34 |
6,82,000 |
|
10 |
Internet Hardware & Networking Accessories |
Router-1: TECHROUTE-1750
Router, I-WAY ROUTER with LAN 10/100Mbps port, WAN port II, IP
S/w, & 1 v.35 DTE cable. |
1 |
50,000 |
|
Router-2: CISCO-2600
Router with IOS IP Software, 2Mbps WAN interface card and v.35
Smart cable. |
1 |
1,55,000 |
|
MODEM: Tellabs-8110 HDSL
2-Mbps Modem, 2.3Mbps Dasan LAN Extender, Fiber Optic cable
with Transceiver. |
1 |
10,000 |
|
LAN Extender: 2-Mbps SDSL |
2 |
20,000 |
|
11 |
D-Link Network
Switches(24-ports) with wall mounted Rack. |
9 |
1,27,800 |
|
D-Link Network
Switches(16-ports) with wall mounted Rack. |
3 |
13,000 |
|
D-Link Network
Switches(8-ports) |
3 |
2,500 |
|
12 |
Printers |
Dot-Matrix Printers |
3 |
42,750 |
|
Laser Printers |
2 |
13,000 |
|
13 |
Online UPS |
TECHSER On-Line UPS System
(5KVA / 120V) |
2 |
1,70,000 |
|
TECHSER On-Line UPS System
(8KVA / 120V) |
1 |
1,40,000 |
|
Aplab On-Line UPS System
(10 KVA) |
3 |
4,71,027 |
|
On-Line UPS System (600VA) |
2 |
2,400 |
|
14 |
Overhead Projectors |
ACER P.D. 115 DLP
PROJECTORS |
2 |
1,03,850 |
|
14 |
Overhead Projectors |
Godrej Prime Vision
projectors with OHP screen |
2 |
30,216 |
|
15 |
Scanner |
HP-5300 Scanner |
1 |
13,550 |
|
|
|
16 |
SOFTWARE (Operating System
& Packages)
|
Microsoft Windows NT4.0 (Server) |
|
34,826 |
|
Microsoft Office 2000 (Professional) |
|
11,925 |
|
Borland Turbo C++ Suit |
|
5,000 |
|
Norton Antivirus 2000 |
|
2,000 |
|
Microsoft Visual Studio6 (Professional) |
|
10,850 |
|
Norton Antivirus 2003 |
|
1,875 |
|
Microsoft Visual Studio .NET (Professional) |
|
3,500 |
|
Norton Antivirus 2005 |
|
1,875 |
|
Microsoft Windows 98SE |
|
|
|
Microsoft Windows XP (Professional) |
|
|
|
RedHat Linux 9.0 Preloaded |
|
|
| |
|
|
|
|
II] List of
Experimental Setup: (All the Required setup are provided for the
below mentioned Labs].
|
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12. |
Computer concepts &
'C' Programming
Network Lab
CGI Lab
System Programming Lab
File Structure Lab
Visual Programming & Database Application Lab
Graphics Lab
OOPS with C++ Lab
Algorithms Lab
Microprocessor Lab
Data Structure Lab
Project Lab |
ã
|
II. MECHANICAL
DEPARTMENT |
|
LVDT |
01 |
| |